
Ahead geological forecasting technology of Bieyancao Tunnel on Yichang-Wanzhou Railway
Ren Shaoqiang
Strategic Study of CAE ›› 2010, Vol. 12 ›› Issue (8) : 99-106.
Ahead geological forecasting technology of Bieyancao Tunnel on Yichang-Wanzhou Railway
Ren Shaoqiang
Bieyancao Tunnel is a key project and listed as level I risky tunnel on Yichang-Wanzhou Railway. This tunnel's geological condition is very complex especially the developed karst cave and underground river. It is considered that serious geological disasters called "LiuMao" phenomena are most likely to occur in construction process. The article introduced that with the help of comprehensive ahead geological forecasting ,this tunnel assured the safety and avoided the geological hazard accidents. It also summarizes the comprehensive geological prediction technology of risky tunnel based on the practice.
risky tunnel / Karst cave / underground river / comprehensive ahead geological forecasting
/
〈 |
|
〉 |