
300 m grade concrete faced rockfill dam adaptability and countermeasures
Ma Hongqi
Strategic Study of CAE ›› 2011, Vol. 13 ›› Issue (12) : 4-8.
300 m grade concrete faced rockfill dam adaptability and countermeasures
Ma Hongqi
This paper summed up the main experiences and lessons of 200 m grade rockfill dam construction,analyzed 4 typical projects of 300 m grade dam, put forward the scientific research and key technical problems of 300 m grade dam.
concrete face rockfill dam / adaptability / countermeasure research
/
〈 |
|
〉 |