Insurance ratemaking method for risk of construction diversion project

Chen Zhiding、Hu Zhigen

Strategic Study of CAE ›› 2011, Vol. 13 ›› Issue (4) : 106-112.

PDF(754 KB)
PDF(754 KB)
Strategic Study of CAE ›› 2011, Vol. 13 ›› Issue (4) : 106-112.

Insurance ratemaking method for risk of construction diversion project

  • Chen Zhiding、Hu Zhigen

Author information +
History +

Abstract

Based on analyzing risk factors of diversion project, synthetic risk rate and engineering insurance period, the frequency and distribution law of loss were researched on the grounds that foundation pit is submerged after diversion project ceases to be effective. And then, the standpoint that these total losses are subject to non homogeneous compound Poisson process is put forward. Furthermore, the collective risk model of the total losses about engineering insurance is established on the basis of construction diversion project risk. Ultimately, insurance ratemaking method for construction engineering risk and its mathematical expression is presented, which provides theoretical method for the insurance ratemaking of hydropower engineering to some extent.

Keywords

diversion risk / engineering insurance / insurance premium / non-homogeneous compound Poisson process

Cite this article

Download citation ▾
Chen Zhiding,Hu Zhigen. Insurance ratemaking method for risk of construction diversion project. Strategic Study of CAE, 2011, 13(4): 106‒112
AI Summary AI Mindmap
PDF(754 KB)

Accesses

Citations

Detail

Sections
Recommended

/