The research on main engineering geological problems in dam-site of Three Gorges Project

Xue Guofu、Chen Youhua

Strategic Study of CAE ›› 2011, Vol. 13 ›› Issue (7) : 51-60.

PDF(1626 KB)
PDF(1626 KB)
Strategic Study of CAE ›› 2011, Vol. 13 ›› Issue (7) : 51-60.

The research on main engineering geological problems in dam-site of Three Gorges Project

  • Xue Guofu、Chen Youhua

Author information +
History +

Abstract

The site geological investigation and research work of the Three Gorges Project (TGP) has lasted for more than 50 years, which catches wide attention at home and abroad due to its depth and extent. The research processes, approaches, contents and basic conclusions for the key engineering geological problems of dam site are briefly introduced, including the deep anti-sliding stability of dam foundation, the high slope stability of permanent ship-lock, the surrounding rock mass stability of the main plant of underground powerhouse and the faulted structures. Finally, an overall summarization and evaluation of the research are presented based on the situations of project construction, monitoring and operation.

Keywords

dam area of TGP / engineering geological problems / investigation and research / summarization

Cite this article

Download citation ▾
Xue Guofu,Chen Youhua. The research on main engineering geological problems in dam-site of Three Gorges Project. Strategic Study of CAE, 2011, 13(7): 51‒60
AI Summary AI Mindmap
PDF(1626 KB)

Accesses

Citations

Detail

Sections
Recommended

/