Study of in situ test to DX pile and post grouting bored pile

Liu Chungang1、Chai Xiaobing1、Ouyang Yi1、He Dexin2

Strategic Study of CAE ›› 2012, Vol. 14 ›› Issue (1) : 80-85.

PDF(2872 KB)
PDF(2872 KB)
Strategic Study of CAE ›› 2012, Vol. 14 ›› Issue (1) : 80-85.

Study of in situ test to DX pile and post grouting bored pile

  • Liu Chungang1、Chai Xiaobing1、Ouyang Yi1、He Dexin2

Author information +
History +

Abstract

The in-situ vertical resisting compression static test of DX pile is made and it is compared with post-grouting bored pile. The results indicate that DX pile and post-grouting bored pile can enhance capacity and control settlement effectively;effect of four test piles is not quite different, but the DX pile is of smaller diameter and shorter length which can meet large capacity; its concrete bearing capacity of per cubic meter is 1.5 times larger than that of post-grouting bored pile; DX pile can reduce engineering materials to lower project cost and speed up the construction progress.

Keywords

DX pile / static load test / bearing capacity / settlement

Cite this article

Download citation ▾
Liu Chungang,Chai Xiaobing,Ouyang Yi,He Dexin. Study of in situ test to DX pile and post grouting bored pile. Strategic Study of CAE, 2012, 14(1): 80‒85
AI Summary
PDF(2872 KB)

Accesses

Citations

Detail

Sections
Recommended

/