Research of steel box girder dehumidification in Taizhou Bridge

Li Lin1、Xu Jun2

Strategic Study of CAE ›› 2012, Vol. 14 ›› Issue (5) : 10-13.

PDF(939 KB)
PDF(939 KB)
Strategic Study of CAE ›› 2012, Vol. 14 ›› Issue (5) : 10-13.

Research of steel box girder dehumidification in Taizhou Bridge

  • Li Lin1、Xu Jun2

Author information +
History +

Abstract

The steel box girder of Taizhou Bridge is 2 160 m long with volume of about 240 thousand m3. The paper analyzes the principle, lectotype, setting, workflow and construction of the steel box girder dehumidification. And the paper protocols the quality inspection and evaluation standards of the steel box girder dehumidification in Taizhou Bridge. It proposes reference for similar project.

Keywords

Taizhou Bridge / steel box girder / dehumidification / research

Cite this article

Download citation ▾
Li Lin and Xu Jun. Research of steel box girder dehumidification in Taizhou Bridge. Strategic Study of CAE, 2012, 14(5): 10‒13
AI Summary AI Mindmap
PDF(939 KB)

Accesses

Citations

Detail

Sections
Recommended

/