Key technology research on construction for the middle tower of suspension bridge
Tian Wei1,2、Liu Jianbo1,2、You Xinpeng1,2
Strategic Study of CAE ›› 2012, Vol. 14 ›› Issue (5) : 23-28.
Key technology research on construction for the middle tower of suspension bridge
Tian Wei1,2、Liu Jianbo1,2、You Xinpeng1,2
The middle tower of Taizhou Bridge consists of deepwater caisson foundation and steel tower with herringbone shape along the longitudinal direction. The construction is complex. Based on previous study, using the technology of up-stream and down-stream anchor pier positioning and the system of information real-time monitoring ensures position and implantation. Meanwhile,control measure is used to prevent caisson sinking suddenly and extra-sinking in final stage. Erection accuracy of steel tower is very high, but adjusted segments are few. During the construction, the structure system changes frequently. To the feature, the method of whole process control based on geometric control is used in the project, which analyzed the error of manufacturing segment, linear of pre-assembled segment and erection, and accuracy management system is established uniformly. The final accuracy of erection is better than that designed. Many innovative technologies are obtained in this project, and the key technologies about construction of deepwater caisson , manufacturing and erection of steel tower are formed, which can be referred for other similar projects in the future.
Taizhou Bridge / anchor pier positioning / real time monitoring / control measure in final stage / whole process control / erection accuracy
/
〈 |
|
〉 |