Determination of lifting sequence of steel box girders of suspension main bridge of Taizhou Bridge

Wang Jun1、Liang Jinda2

Strategic Study of CAE ›› 2012, Vol. 14 ›› Issue (5) : 41-45.

PDF(1166 KB)
PDF(1166 KB)
Strategic Study of CAE ›› 2012, Vol. 14 ›› Issue (5) : 41-45.

Determination of lifting sequence of steel box girders of suspension main bridge of Taizhou Bridge

  • Wang Jun1、Liang Jinda2

Author information +
History +

Abstract

Taizhou Bridge is the first three-tower two-span suspension bridge with spans over 1 000 m in the world. Its main spans are 2×1 080 m; the middle tower is a steel frame with longitudinal herringbone shape and lateral gate shape; the side towers are gate shaped concrete frames; the stiff girder consists of flat streamline steel box girders, with a total of 136 steel box girders of about 33 426 t for the whole bridge. This article determines the proper lifting sequence of steel box girders of this threetower suspension bridge by analyzing the effect of steel box girders lifting sequence on structural system and difficulty in construction .

Keywords

three tower two pan suspension bridge / steel box girder / lifting sequence

Cite this article

Download citation ▾
Wang Jun and Liang Jinda. Determination of lifting sequence of steel box girders of suspension main bridge of Taizhou Bridge. Strategic Study of CAE, 2012, 14(5): 41‒45
AI Summary AI Mindmap
PDF(1166 KB)

Accesses

Citations

Detail

Sections
Recommended

/