Construction of in-hospital neutron irradiator

Li Yiguo1,2、Xia Pu1、Peng Dan1、Zou Shuyun1、Wu Xiaobo1、Zhang Jinhua1、Zhang Yongbao1、Zhang Zizhu1、Liu Tong2、Zhou Yongmao3

Strategic Study of CAE ›› 2012, Vol. 14 ›› Issue (8) : 17-19.

PDF(952 KB)
PDF(952 KB)
Strategic Study of CAE ›› 2012, Vol. 14 ›› Issue (8) : 17-19.

Construction of in-hospital neutron irradiator

  • Li Yiguo1,2、Xia Pu1、Peng Dan1、Zou Shuyun1、Wu Xiaobo1、Zhang Jinhua1、Zhang Yongbao1、Zhang Zizhu1、Liu Tong2、Zhou Yongmao3

Author information +
History +

Abstract

The construction of in-hospital neutron irradiator (IHNI) started in 2007. Its building construction was completed in Dec. 2008, and the installation and test of the relevant systems were completed in Mar. 2009. The first criticality was achieved on Dec. 7, 2010. The reactor reached the full power on Jan. 22, 2010. The test results show that the final excess reactivity is 4.2 mk; the maximum continuous operation time at full power is 12 h and the power wave is less then 0.3 % during full power operation; when the positive reactivity with 4.2 mk is inserted into the reactor suddenly, the power will be increased to 85.7 kW at the time of 229 s, and then, it will turn to the normal value due to the negative temperature effect.The release result of reactivity shows the inherent safety of reactor.

Keywords

in-hospital neutron irradiator(INHI) / commissioning / startup

Cite this article

Download citation ▾
Li Yiguo,Xia Pu,Peng Dan,Zou Shuyun,Wu Xiaobo,Zhang Jinhua,Zhang Yongbao,Zhang Zizhu,Liu Tong,Zhou Yongmao. Construction of in-hospital neutron irradiator. Strategic Study of CAE, 2012, 14(8): 17‒19
AI Summary AI Mindmap
PDF(952 KB)

Accesses

Citations

Detail

Sections
Recommended

/