Study on Hengsha deepwater port location and maintainability in Yangtze estuary

Lou Fei、Ji Lan、Chen Zhong、Wang Dawei

Strategic Study of CAE ›› 2013, Vol. 15 ›› Issue (6) : 108-112.

PDF(1773 KB)
PDF(1773 KB)
Strategic Study of CAE ›› 2013, Vol. 15 ›› Issue (6) : 108-112.

Study on Hengsha deepwater port location and maintainability in Yangtze estuary

  • Lou Fei、Ji Lan、Chen Zhong、Wang Dawei

Author information +
History +

Abstract

Hengsha east shoal is a large mouth bar in Yangtze estuary. The main problem of building large excavated-in deepwater harbor basin here is the maintainability of the basin and waterway. In this paper, on the basis of the characteristics of current and sediment, the basin and its entrance sites selection and the maintainability of the basin and waterway are discussed. The results show that the entrance of the basin should be set in the east side of Hengsha east shoal and on the south of Jigu reef, and towards southeast. The entrance and waterway should be built in the area where the depth is greater than 10 m. If do so, the tidal prism is large; the siltation is small, and the maintainability is good.

Keywords

Yangtze estuary / Hengsha east shoal / excavated-in deepwater harbor basin / site selection / maintainability

Cite this article

Download citation ▾
Lou Fei,Ji Lan,Chen Zhong,Wang Dawei. Study on Hengsha deepwater port location and maintainability in Yangtze estuary. Strategic Study of CAE, 2013, 15(6): 108‒112
AI Summary AI Mindmap
PDF(1773 KB)

Accesses

Citations

Detail

Sections
Recommended

/