Make full use of the dredged soil for speeding up reclamation of Hengsha east shoal

Zhou Hai、Tang Chen、 Ji Lan

Strategic Study of CAE ›› 2013, Vol. 15 ›› Issue (6) : 30-34.

PDF(1311 KB)
PDF(1311 KB)
Strategic Study of CAE ›› 2013, Vol. 15 ›› Issue (6) : 30-34.

Make full use of the dredged soil for speeding up reclamation of Hengsha east shoal

  • Zhou Hai、Tang Chen、 Ji Lan

Author information +
History +

Abstract

According to Hengsha east shoal reclamation projects implementation, combined with the Yangtze estuary harbors and channels dredged soil disposal condition, this paper analyses the main problems of using the Yangtze estuary dredged soil to Hengsha east shoal reclamation. According to Hengsha ocean metro construction planning, it calculates reclamation scale and soil demand, and proposes the implementation principles and scheme of using the Yangtze estuary dredged soil for speeding up Hengsha east shoal reclamation, and gives some helpful suggestions.

Keywords

Yangtze estuary / dredged soil resources / Hengsha east shoal / speeding up reclamation

Cite this article

Download citation ▾
Zhou Hai,Tang Chen,Ji Lan. Make full use of the dredged soil for speeding up reclamation of Hengsha east shoal. Strategic Study of CAE, 2013, 15(6): 30‒34
AI Summary AI Mindmap
PDF(1311 KB)

Accesses

Citations

Detail

Sections
Recommended

/