Study of implement scheme for using Yangtze estuary waterways dredged soil to Hengsha east shoal reclamation

Tang Chen、Ji Lan、Jia Yushao

Strategic Study of CAE ›› 2013, Vol. 15 ›› Issue (6) : 91-98.

PDF(1946 KB)
PDF(1946 KB)
Strategic Study of CAE ›› 2013, Vol. 15 ›› Issue (6) : 91-98.

Study of implement scheme for using Yangtze estuary waterways dredged soil to Hengsha east shoal reclamation

  • Tang Chen、Ji Lan、Jia Yushao

Author information +
History +

Abstract

According to the Yangtze estuary waterway construction and planning conditions, combined with the Hengsha new ports plan idea, the paper proposes the implement scheme for using Yangtze estuary waterway dredged soil to Hengsha east shoal reclamation, and analyzes technical feasibility and economic reasonableness, and put forward useful suggestions for using dredged soil for reclamation. The study of implement scheme can give technical reference for the design and construction of similar reclamation projects in Hengsha east shoal or the Yangtze estuary region.

Keywords

Yangtze estuary / Hengsha east shoal / waterway dredging soil / dredge filling technology

Cite this article

Download citation ▾
Tang Chen,Ji Lan,Jia Yushao. Study of implement scheme for using Yangtze estuary waterways dredged soil to Hengsha east shoal reclamation. Strategic Study of CAE, 2013, 15(6): 91‒98
AI Summary AI Mindmap
PDF(1946 KB)

Accesses

Citations

Detail

Sections
Recommended

/