Construction technology of tower column of Three Gorges Project ship lift

Zhou Jianhua

Strategic Study of CAE ›› 2013, Vol. 15 ›› Issue (9) : 15-21.

PDF(1134 KB)
PDF(1134 KB)
Strategic Study of CAE ›› 2013, Vol. 15 ›› Issue (9) : 15-21.

Construction technology of tower column of Three Gorges Project ship lift

  • Zhou Jianhua

Author information +
History +

Abstract

This paper firstly describes the whole construction program of the tower column. Then the important and difficult construction problems have been analyzed, such as the precision control of civil structure, the precision control of metal structures and its embedded parts, concrete temperature control and crack prevention, and safety control. At the same time, the construction surveying control technique, the temperature control and crack prevention technique of thin wall concrete, high precision concrete continuous and rapid construction technique,metal structure construction technique,and the construction technique of high altitude and large span beam structure have been made a systemic summary. The application of those construction techniques meets the requirement of high precision construction of the tower column and ensures its smooth construction. Meanwhile, these construction techniques lay a solid foundation for the construction of similar projects.

Keywords

ship lift / tower column / construction techniques / Three Gorges Project

Cite this article

Download citation ▾
Zhou Jianhua. Construction technology of tower column of Three Gorges Project ship lift. Strategic Study of CAE, 2013, 15(9): 15‒21
AI Summary AI Mindmap
PDF(1134 KB)

Accesses

Citations

Detail

Sections
Recommended

/