High precision installation technology of metal structure embedded parts of Three Gorges Project ship lift

Wei Shuman、Zhang Weiming、Li Chenzhi

Strategic Study of CAE ›› 2013, Vol. 15 ›› Issue (9) : 87-90.

PDF(971 KB)
PDF(971 KB)
Strategic Study of CAE ›› 2013, Vol. 15 ›› Issue (9) : 87-90.

High precision installation technology of metal structure embedded parts of Three Gorges Project ship lift

  • Wei Shuman、Zhang Weiming、Li Chenzhi

Author information +
History +

Abstract

Based on the layout characteristics of the first-stage and second-stage metal structure embedded parts, and combined with the site construction environment, this article analyzes the high precision installation method in detail. At the same time, various construction plans which are suitable for Three Gorges Project ship lift are put forward. These construction plans which have been successfully used in Three Gorges Project have solved many technological problems, such as the deformation control of the embedded parts, fast and accurate positioning, high precision measurement and so on. Meanwhile, these technologies provide a reference for the constructions of similiar projects.

Keywords

ship lift / metal structure embedded parts / high precision / installation technology / Three Gorges Project

Cite this article

Download citation ▾
Wei Shuman,Zhang Weiming and Li Chenzhi. High precision installation technology of metal structure embedded parts of Three Gorges Project ship lift. Strategic Study of CAE, 2013, 15(9): 87‒90
AI Summary AI Mindmap
PDF(971 KB)

Accesses

Citations

Detail

Sections
Recommended

/