Risk management of the projecton the first large passenger plane

Qiu Wanhua

Strategic Study of CAE ›› 2014, Vol. 16 ›› Issue (10) : 31-38.

PDF(2209 KB)
PDF(2209 KB)
Strategic Study of CAE ›› 2014, Vol. 16 ›› Issue (10) : 31-38.

Risk management of the projecton the first large passenger plane

  • Qiu Wanhua

Author information +
History +

Abstract

Put forward three-dimensional risk management method and entropy-risk assessment, solve many difficult international problems on the develop project on the first large passenger plane. Solve the key problems of life-cycle risk management on organization, schedule and so on. Create risk management model of large-scale project on transnational development which integration into the global allocation, and operational system of integrated management of cluster (APM-BOK V4.0). To accomplish the project with low risk and high quality efficiency, building a management platform of information risk integration.

Keywords

large-scale projects management / risk management / entropy–optimization / project cluster management

Cite this article

Download citation ▾
Qiu Wanhua. Risk management of the projecton the first large passenger plane. Strategic Study of CAE, 2014, 16(10): 31‒38
AI Summary AI Mindmap
PDF(2209 KB)

Accesses

Citations

Detail

Sections
Recommended

/