Key construction technology of shallow-buried large span highway tunnel through rich water soft soil layer

Zhao Licai

Strategic Study of CAE ›› 2015, Vol. 17 ›› Issue (1) : 81-87.

PDF(4460 KB)
PDF(4460 KB)
Strategic Study of CAE ›› 2015, Vol. 17 ›› Issue (1) : 81-87.

Key construction technology of shallow-buried large span highway tunnel through rich water soft soil layer

  • Zhao Licai

Author information +
History +

Abstract

This article takes Xia-Zhang highway (Xiamen section) Dongfu tunnel construction as an example. Introduces the application of ?299 big pipe follow with pipe drilling occlusal and linking reinforcement technology+cross-located right next door after disassembly type excavation technology in shallow-buried rich water soft soil stratum tunnel excavation process. While using TGMIS dynamic intelligent monitoring system of construction settlement conditions for data acquisition, analysis and processing, make the deformation of surrounding rock control, successfully passed the construction of shallow-buried soft soil excavation.

Keywords

shallow buried / rich water soft soil / tunnel / pipe / reinforcement / cross-located right next door after disassembly type / excavation

Cite this article

Download citation ▾
Zhao Licai. Key construction technology of shallow-buried large span highway tunnel through rich water soft soil layer. Strategic Study of CAE, 2015, 17(1): 81‒87
AI Summary AI Mindmap
PDF(4460 KB)

Accesses

Citations

Detail

Sections
Recommended

/