Ever since 1994, the evaluations made by expert have proved that the wheel/rail approach for the Beijing-Shanghai High Speed Railway is feasible. However there were three academicians who proposed in 1999 that China was not suitable to develop wheel/rail type high speed trains and great efforts should be paid to development of maglev trains. Then what are the reasons for almost 10 countries and regions in the world that have constructed or are constructing or are planning to construct this type of high speed railways and none of them have constructed a maglev line in real revenue service so far. And in particular why there still exits a big debate on the development of maglev even in Japan and Germany that have long-term test and research experience. For the latter question, the three academicians have the following explanations: The superiority of maglev system can not be brought into full play due to the fact that the distance from the capitals to major cities is relatively short, the high speed highway network and the wheel/rail type high speed railway network are already available, and they do not feel any urgent needs. The author holds that the crucial point, which is a decisive factor, is that maglev system is rather poor in economic benefits and it is by no means perfect technically. The paper also points out that the maglev system has no superiority over civil aviation and high speed railways in terms of technology and economy except that its speed is higher than wheel/rail type railways. Therefore, the so-called “technical leap-forward”,is hard to find ground. The author proposes that it is better to carry out feasibility study of follow-up nature with regard to the application of maglev system no high speed railways. It is not appropriate to spend several hundred million yuan to build a test section. It is essential to approve the wheel/rail type Beijing - Shanghai High Speed Railway at an early date.

References

[ 1 ] 中国工程院 关于呈报《磁悬浮高速列车与轮轨高速列车的技术比较和分析》的咨询报告 [A] 见 :中国工程院咨询工作委员会编 工程科技与发展战略咨询报告集 [R] 北京 :中国工程院 , 2 0 0 0 2 91~ 30 0

[ 2 ] 徐冠华 , 何祚庥 , 严陆光 磁悬浮方案是正确的战略抉择 [A] 见 :中国国际工程咨询公司 高速轮轨与磁悬浮系统比较研讨会咨料 [R] 北京 , 1 999年 9月

[ 3 ] 吴玉树 , 谢贤良 国外高速铁路发展状况及社会经济效益综述 [J] 中国铁路 , 1 999, (6) :1 8~ 2 3 link1

[ 4 ] 参考消息 , 2 0 0 0 - 0 2 - 0 7

[ 5 ] 臧其吉 , 吴玉树 , 曾树谷 , 等 高速铁路是运输市场竞争和科学技术进步的产物 [J] 中国工程科学 , 2 0 0 0 , 2 (5) :1~ 7 link1

[ 6 ] 何邦模 修建高速铁路是京沪铁路扩能的需要 [J] 中国铁路 , 1 999, (6) :9~ 1 3 link1

[ 7 ] 中国铁路代表团 德、法高速铁路考察报告 [R] 1 997年 7月

[ 8 ] 中国工程院 关于呈报《日本高速铁路及其磁浮高速列车的比较考察报告》的报告 [A] 见 :中国工程院咨询工作委员会编 工程科技与发展战略咨询报告集[R] 北京 :中国工程院 , 2 0 0 0 30 5~ 31 5

[ 9 ] 华允璋 京沪高速铁路近年期间不宜立项上马 [J] 科技导报 , 1 998, (8) :2 3~ 2 6 link1