Journal Home Online First Current Issue Archive For Authors Journal Information 中文版

Strategic Study of CAE >> 2002, Volume 4, Issue 6

Deformation Rate Ratio Criterion (DRRC) and Its Verification in Maoshan Tunnel Excavation

1.The 4th Design and Research Institute , Department of the Engineer Corps , H. Qs of the General Staff of PL A , Beijing 100850, China

2.No. 4 Department of the No. 14 Railway Construction Bureau , Xinhui, Guangdong 529149, China

Funding project:中国科学院工程地质力学开放研究实验室资助课题 Received: 2001-12-03 Revised: 2002-01-14 Available online: 2002-06-20

Next Previous

Abstract

In order to help solving the technical puzzles of lacking in scientific, reasonable and quantitative surrounding rock stability criteria in the initial lining during tunneling excavation by NATM and occurring of many cave-ins, in this paper some viewpoints are put forward, the essentials of which are as follows: 1. Advance the basis for the hypothesis of deformation rate ratio criterion (DRRC) and the method for obtaining the threshold of this criterion, and enumerate five typical cases for the application of this criterion to the tunnelingexcavation; 2. The success and failure in the Maoshan expressway tunnel excavation are deducted and verified from positive and negative aspects. DRRC was used in two excavating sections to forecasted dangerous situations resulting in coming safely out of cave-in accidents, while the use of DRRG was compelled to stop in another excavating section and a big cave-in accident happened; 3. Obtain the method of DRRC for constituting a typical information method, which is characterized by the combination of prototype information and typical information. DRRC is a kind of hypothetico-deductive method, and it is also a preliminary application of metasynthesis from the qualitative to the quantitative.

Figures

图1

图2

图3

References

[ 1 ] 李华晔.国内外地下洞室建设与地质灾害综述[A].中国岩石力学与工程学会编.中国岩石力学与工程学会第五次学术大会论文集[C].北京:中国科学技术出版社, 1998.63~69

[ 2 ] 孙广忠.工程地质与地质工程[M ].北京:地震出版社, 1993

[ 3 ] [美]O’RourkeTD .隧道衬砌设计指南[M ].侯学渊, 李桂花, 孙逸民译.北京:中国铁道出版社, 1984

[ 4 ] [日]土木学会.日本隧道标准规范 (山岭篇) 及解释[M ].1986改订版.关宝树等译.成都:西南交通大学出版社, 1988 link1

[ 5 ] [日]国有铁道建设局等.NATM设计施工指南[J].吴佛明译.铁道标准设计通讯, 1986, (总252) :1~120

[ 6 ] 关宝树.隧道力学概论[M].成都:西南交通大学出版社, 1993

[ 7 ] 李世, 赵玉绂, 徐复安, 等.隧道支护设计新论———典型类比分析法应用和理论[M ].北京:科学出版社, 1999

[ 8 ] 钱学森.再谈开放的复杂巨系统[A].钱学森, 黄秉维, 竺可桢, 等.论地理科学[M].杭州:浙江教育出版社, 1994.164~171 link1

[ 9 ] 李世, 吴向阳, 尚彦军.地下工程半经验半理论设计方法的理论基础———围岩—支护系统是一种开放的复杂巨系统[J].岩石力学与工程学报, 2002, 21 (3) :299~304

[10] 钱学森, 于景元, 戴汝为.一个科学新领域———开放的复杂巨系统及其方法论[J].自然杂志, 1990, 13 (1) :3~10

[11] GBJ86-85, 锚杆喷射混凝土技术规范[S].1985 link1

[12] 李世.围岩-支护动态系统稳定性判据———变形速率比值判别法[J].水电站设计, 1992, 8 (3) :20~25 link1

[13] LiS .Anempiricalhypothesisofdeformationrateratiocriterion[J].RockMechRockEngng, 1996, 29 (2) :63~72