Impact of the Three Gorges Project on the Water Level and Navigation Channel in the Near-dam Reach Downstream The Gezhouba Project

1. Nanjing Hydraulic Research Institute , Nanjing 210029, China

2. Department of Hydraulic Engineerings Tsinghua University, Beijing 100084, China

3. Tianjin Institute of Water Transport Engineering, Ministry of Communications , Tianjin 300456, China

4. Hydrology and Water Resources Exploration Survey of the Three Gorges , Yichang, Hubei 443001, China

Funding project:“九五”三峡泥沙科研项目(95-1-1)部分成果 Received: 2002-01-28 Revised: 2002-05-14 Available online: 2002-10-20

Next Previous

Abstract

The river channel change, the bed load and bed material armoring, and the water level lowering after the operation of the Gezhouba project are analyzed based on the topographic and hydrologic data. The water level lowering and it's impact on navigation in the period of construction and initial stage operation of the Three Gorges project are predicted by use of the results of mathematical and physical model.

Figures

图1

图2

图3

References

[ 1 ] 李云中.葛洲坝枢纽下游水位及推移质变化分析[R].长江水利委员会三峡水文水资源勘测局, 2000

[ 2 ] 陆永军, 陈稚聪, 赵连白, 等.葛洲坝枢纽下游水位变化对船闸与航道影响及对策研究[R].交通部天津水运工程科学研究所, 清华大学水电工程系, 长江科学院, 2000

[ 3 ] 杨美卿.葛洲坝枢纽下游河段一维泥沙数学模型研究[R].清华大学水电工程系, 2000

[ 4 ] 陆永军.葛洲坝枢纽船闸航道通航水深问题解决措施的二维泥沙数学模型研究[R].交通部天津水运工程科学研究所, 2000

[ 5 ] 陈稚聪, 邵学军.葛州坝枢纽至虎牙滩河段 (1/300, 1/150) 模型试验研究报告[R].清华大学水电工程系, 2000

[ 6 ] 赵连白, 陆永军.葛州坝枢纽至虎牙滩河段 (1/200, 1/80) 模型试验研究报告[R].交通部天津水运工程科学研究所, 2000