Journal Home Online First Current Issue Archive For Authors Journal Information 中文版

Strategic Study of CAE >> 2002, Volume 4, Issue 12

Application of Vibrating Wire Pressure Cell for Stress Monitoring on Rigid Interface

1. Hohai University, Nanjing 210098, China

2. Bureau of Communication of Jiangsu Province, Nanjing 210004, China

3. Design Institute of Yunnan Province, Kunming 610041, China

Received: 2002-05-24 Revised: 2002-07-10 Available online: 2002-12-20

Next Previous

Abstract

In this paper, the structure and testing principle of vibrating wire pressure cell are presented firstly. Then, combined with the practice in the south anchorage of Jiangyin Yangtze Bridge, the feasibility and difficulty to monitor stress of rigid interface using vibrating wire pressure cell are analyzed. The expression of rating factor is deduced. And on the base of FEM, the method to modify observation data is introduced. Finally, the relationship between modification factor and medium rigidity is deduced. Study results indicate that, while monitoring the stress of rigid interface, the observed values are less than the actual stress values. Even, they are approximately one tenth of the theoretical value. The reason is that the real load condition of the pressure cell is obviously different from the rating load condition. The rigidity of medium affects observation results.

Figures

图1

References

[ 1 ] 二滩水电开发有限责任公司.岩土工程安全监测手册[M].北京:中国水利水电出版社, 1998.13~18, 149~151 link1

[ 2 ] 刘蕴华, 张乃良.数学物理方程及其应用[M ].南京:河海大学出版社, 1994.63~72 link1

[ 3 ] 徐芝伦.弹性力学 (下册, 第二版) [M ].北京:高等教育出版社, 1987.30~40

[ 4 ] 李造鼎.岩体测试技术 (修订版) [M ].北京:冶金工业出版社, 1993.180~181 link1

[ 5 ] JerffreyS .Y , 周世忠.JiangyinYangzeBridge, China[A].江苏省长江公路大桥建设指挥部编.江阴长江公路大桥工程建设论文集[C].北京:人民交通出版社, 2000.530~533 link1

[ 6 ] 陈志坚, 卓家寿, 刘世君.干扰位移法及层状岩质边坡滑动边界的确定[J].岩石力学与工程学报, 2000, 19 (5) :630~633 link1

[ 7 ] 陈志坚.层状岩质高边坡稳定监测技术[J].中国工程科学, 2001, 3 (5) :86~91 link1

[ 8 ] 丁腊荣.江阴长江公路大桥南锚碇施工温度控制[A].江苏省长江公路大桥建设指挥部编.江阴长江公路大桥工程建设论文集[C].北京:人民交通出版社, 2000.162~165