Journal Home Online First Current Issue Archive For Authors Journal Information 中文版

Strategic Study of CAE >> 2003, Volume 5, Issue 7

Realization of the First Water Plant with Biological Removal of Iron and Manganese

Beijing University of Technology, Department of Architecture and Civil Engineering, Beijing 100022, China

Received: 2003-03-05 Available online: 2003-07-20

Next Previous

Abstract

The project was designed according to the theory of biological fixation and removal of manganese. The process included weak aeration and one filtration. Inoculating the aboriginal manganese removal bacteria from raw water, after 2~3 months culture, the filter obtained the strong manganese removal ability. Under the condition of usual filtrating rate, manganese in treated water was 0.05 mg/L,and TFe was trace which were superior to the national standard although the manganese in raw water was 1~3 mg/L and TFe was 0.1~0.5 mg/L. The quality of the treated water was stable and met the industry requirement. This theory solved the difficulty of manganese removal over the past harf of century and built the fist biological removal of iron and manganese water plant in the world.

Figures

图1

图2

图3

图4

图5

图6

图7

图8

图9

References

[ 1 ] 李圭白, 刘 超地下水除铁除锰[M].北京:中国建筑工业出版社, 1989 link1

[ 2 ] 张 杰, 杨 宏, 徐爱军.生物固锰除锰技术的确立[J].给水排水, 1996, 22 (5) :5~10 link1

[ 3 ] 张 杰, 杨 宏, 徐爱军.Mn2+氧化细菌的微生物学研究[J]给水排水, 1997, 23 (1) :19~23 link1

[ 4 ] 李 冬, 杨 宏, 张 杰.生物滤层同时去除地下水中铁锰离子的实验研究[J].中国给水排水, 2001, 17 (8) :1~5 link1

[ 5 ] 鲍志戎.自来水厂除锰滤砂的催化活性分析[J].环境科学, 1997, 18 (1) :38~41 link1

[ 6 ] 张 杰, 杨 宏, 李 冬.生物滤层中Fe2+的作用及对除锰的影响[J].中国给水排水, 2001, 17 (9) :14~16 link1

[ 7 ] 张 杰, 戴镇生.地下水除铁除锰现代观[J].给水排水, 1996, 22 (10) :13~20 link1

Related Research