Journal Home Online First Current Issue Archive For Authors Journal Information 中文版

Strategic Study of CAE >> 2004, Volume 6, Issue 2

Selection and Verification of the Structural Pattern of the Penstock and Spiral Case of the TGP Power-station

China Yangtze Three Gorges Project Development Corporation , Yichang Hubei 443002 , China

Received: 2003-03-20 Revised: 2003-07-08 Available online: 2004-02-20

Next Previous

Abstract

The article introduced the selection and verification of the structural pattern of the penstock and spiral case of the TGP power-station. The decisions on the key technical issues in the construction of the TGP were made based on a huge number of scientific tests and verifications. The selection of the structural pattern of the penstock and spiral case in the TGP power-station is not only an important technical and economic issue, but also an issue relating to the long-term operation of the power-station.

Keywords

TGP ; penstock ; spiral case

References

[ 1 ] 长江三峡水利枢纽水电站压力管道形式选择专题报告[R].武汉:长江水利委员会, 1993

[ 2 ] 长江水利委员会.长江三峡水利枢纽电站压力管道优化设计报告[R].武汉:长江水利委员会, 1998

[ 3 ] 长江水利委员会.三峡水电站水轮机蜗壳充水加压方案专题研究报告[R].武汉:长江水利委员会, 1999

[ 4 ] 张光斗.关于三峡二期工程几个技术问题的意见[J].中国三峡建设, 1999, (1) :33~34 link1

Related Research