Strategic Study of CAE >> 2004, Volume 6, Issue 6

Dynamic Visual Simulation for Concrete Dam Construction Process of the Xiangjiaba Hydro Station

1. State Key Laboratory of Water Resource and Hydropower Engineering Science, Wuhan University, Wuhan 430072, China

2. Mid-South Design and Research Institute for Hydroelectric Projects, Changsha 410014, China

Received: 2004-01-06 Revised: 2004-03-11 Available online: 2004-06-20

Next Previous

Abstract

In view of simulation for concrete dam construction process of the Xiangjiaba Hydro Station, the paper systemically analyses the relation and condition among various main factors during concrete dam construction process. An integration plan, with tower belts and cable cranes as the main equipment and the gantry cranes, belt conveyers as the supplementary equipment, has been adopted for Xiangjiaba construction. By using algorithmic procedure of choosing block from separate bin, simulation result for concrete dam construction is made in the form of three-dimension visual simulation. Furthermore, the authors haveresolved key questions of optimizing execution program of work, matching construction machine and equipment and verification of dam construction schedule.

Figures

图1

图2

图3

图4

图5

References

[ 1 ] 袁光裕编著.水利工程施工[M]. 北京:中国水利水电出版社,1996

[ 2 ] 孙锡衡等莉水利水电工程计算机模拟与程序设计 [M]. 北京:中国水利水电出版社,1997

[ 3 ] 申明亮等. 龙滩高碾压混凝土重力坝施工过程模拟[J],中国农村水利水电,2003,(6):113一116

[ 4 ] 孙荣恒,李建平、排队论基础 [M]. 北京:科学出版社,2002

[ 5 ] 康凤举主编. 现代仿真技术与应用 [M]. 北京:国防大学出版社,2001

[ 6 ] 徐青著.地形三维可视化技术 [M]. 北京:测给出版社

Related Research