New Technology for Production of Synthetic Rutile by Pressure Leaching and Preparation of Sponge Titanium by Molten-salt electrolysis

1. University of Science and Technology Beijing, Beijing 100083, China

2. Beijing General Research Institute of Mining and Metallurgy, Beijing 100044, China

Received: 2004-04-23 Revised: 2004-06-23 Available online: 2004-12-20

Next Previous

Abstract

This paper summarizes the status and problems of production of synthetic rutile and sponge titanium and discusses the restricting factors of titanium production. Experiments have been, conducted on preparation of synthetic rutile by pressure leaching and the content of TiO2 of the rutile is more than 96%. The production of sponge titanium by molten-salt electrolysis is under research.

Figures

图1

图2

图3

References

[ 1 ] 隋建新稀盐酸加压浸出攀枝花钛精矿生产人造金红石的探讨[J].轻金属, 1997, (9) :43~45 link1

[ 2 ] [anon].钛的生产技术[J].稀有金属快报, 2002, (5) :1~4

[ 3 ] [anon].世界钛应用开发现状[J].钛工业进展, 2000, (6) :35~36

[ 4 ] 王晖.世界钛市场新变化与我国钛生产现状[J].轻金属, 1999, (4) :18~20 link1

[ 5 ] 从第10届世界钛会议看当前世界钛工业的主要趋势[J].钛工业进展, 2003, (6) :6~8 link1

[ 6 ] 文华里.世界钛生产技术与钛用途开发新动向[J].轻金属, 1997, (8) :4~7 link1

[ 7 ] [anon].钛冶炼新工艺开发[J].稀有金属快报, 2002, (9) :9

Related Research