Predictive Analysis and Observational Construction for aLarge-Scale Underground Powerhouse Cavern Complex

1. Expert's Committee of the South唱to唱North Water Diversion Project Commission of the State Council, Beijing 100053, China ;

2. Hohai University, Nanjing 210098, China

Received: 2006-06-20 Revised: 2006-08-18

Next Previous

Abstract

In this paper, the predictive analysis and observational construction for the large-scale underground powerhouse cavern complex in Tianhuangping pumped storage power station are presented. The predictive analysis was carried out in three dimensions by FEM that simulated the actual staged excavation procedures. The analysis provides the sufficient information on the deformation evolution and the potential yielding zones in the cavern rocks. Based on the analysis results and the geological observation as well as the instrument measurement made during the construction, the design supporting parameters for the safety of the cavern rocks were adjusted timely. As a result, the underground powerhouse complex was successfully constructed.

Figures

图 1

图 2

图 3

图 4

图 5

图 6

图 7

图 8

References

[ 1 ] リ 一 ズ 16 .岩构造物 の 情报化设计施工 [M] .日本东京 :社团法人日本地工学会 ,2003 .69 ~ 126 .

[ 2 ] 前岛俊雄 ,森宏之 ,平井秀幸 .神流川电所空洞 掘削 に お け る 情报化施工[J] .日本电力土木 ,2001 , (291) :16 ~ 20畅

[ 3 ] 工藤圭吾 ,小山俊博 ,小松崎勇一 .大规模地下空洞 掘削 へ の 情报化设计施工技术 の 适用研究[J] .日 本土木学会论文集 ,1999 ,6 ,No .623桙 Ⅵ - 43 :69 ~ 83畅 link1

[ 4 ] 魏庭光 ,汪易森 ,邓昌铁 .天荒坪抽水蓄能电站地下 厂房洞室群围岩三维弹塑性有限元分析报告[R] . 北京 ,1996

[ 5 ] 杨小珑 ,孔 勇 .天荒坪抽水蓄能电站地下厂房围 岩支护设计[J] .水力发电 ,1998 ,(8) link1

Related Research