Journal Home Online First Current Issue Archive For Authors Journal Information 中文版

Strategic Study of CAE >> 2007, Volume 9, Issue 9

Determination Model for Replacement of Water Pipeline

1. North China Municipal Engineering Design &Research Institute, Tianjin 300074, China;

2. School of Environmental Science and Engineering, Tianjin University, Tianjin 300072, China;

3. Tianjin Huashui Waterworks Construction Co.Ltd.,Tianjin 300122, China

Funding project:国家自然科学基金资助项目 (50578108) Received: 2006-04-28

Next Previous

Abstract

A fund distribution model for water pipeline replacement at the level of limited fund is established.  By analyzing maintenance fee of pipe network and construction fee,  and decreasing the difference of pipeline maintenance fee before and after replacement at the most,  the pipeline needed to be replaced is determined.  The establishment of model makes construction fund be utilized fully,  and decreases pipeline leakage loss most effcfivedy,  and provides theoretical support and guidance for water supply department to utilize fund reasonably,  control leakage loss and production and marketing difference ratio effectively.

References

[ 1 ] Male J W, Franz S L.Allocating funds for repair of leaky water distribution systems [ J ] . TIMS Studies in the Management Sciences, 1986 , 22 ( 3 ) :183 ~203

[ 2 ] Bach N L, Fujiwara O,Luong H T.Optimal fund assignment and allocation models for pipe repair maintenance in leaky water distribution networks [ J ] .Water Resources Research , 2000 , 36 ( 5 ) :1315 ~1324 link1

[ 3 ] Luong H T, Fujiwara O.Fund allocation model for pipe repair maintenance in water distribution networks[ J] .European Journal of Operational Research,2002 , 136 ( 5 ) ,403 ~421 link1

[ 4 ] 傅玉芬.城市供水管网漏损控制[D].天津:天津大学,2004 link1

[ 5 ] 国家发展计划委员会建设部.工程勘察设计收费标准[M].北京:中国物价出版社,2002:88~89

Related Research