Abstract

On the basis of the research results of the project, the Research on the Industrialization of Freely Supported Box and Girder for Passenger Express Line, in Ministry of Railways and China Railway Construction Corporation, and the programming and design experience for almost 30 girder prefabrication fields, the three important aspects of girder field construction, i.e. site election, plane layout and corollary equipment, are discussed in depth.

Figures

图 1

图 2

图 3

图 4

图 5

图 6

图 7

图 8

图 9

图 10

图 11

图 12

图 13

图 14

图 15

图 16

References

[ 1 ] TZ213-2005.客运专线铁路桥涵工程施工技术指南[S].北京:中国铁道出版社,2005

Related Research