Strategic Study of CAE >> 2009, Volume 11, Issue 7

Key tunneling technology and configuring big machines in Qingdao Jiaozhouwan subsea tunnel

1. Beijing Jiaotong University, Beijing 100044, China;

2. China Railway 16th Group Co., Ltd., Beijing 100018, China

Received: 2008-04-08 Available online: 2009-07-10 15:05:27.000

Next Previous

Abstract

Qingdao Jiaozhouwan tunnel is 7 800 m, and subsea tunnel is 3 950 m. There are 2 main traffic tunnels and 1 serving tunnel. Accessorial tunnel passing in or out the main traffic tunnel is founded at 2 000 m part from gate in Qingdao. Space between the center lines of the 2 main traffic subsea tunnesl is 55 m. The section is oblong, width is 16 m, and height is 12 m. The tunnel is through slightly weathering granite, dolerite and andesite. Its vertical section is "V"  slope. The maximum seawater depth is 42 m and the minimal rock cover depth is 30 m.The key tunneling technology and configuring big machines of drilling and blast for constructing Qingdao Jiaozhouwan subsea tunnel were discussed in this thesis.

Figures

图1

图2

图3

图4

图5

图6

图7

图8

图9

图10

图11

图12

Related Research