Journal Home Online First Current Issue Archive For Authors Journal Information 中文版

Strategic Study of CAE >> 2009, Volume 11, Issue 7

Simulation experiment of pumped sand on immersed tunnel

1.School of Civil Engineering, Beijing Jiaotong University, Beijing 100044, China;

2. China Railway Tunnel Group Ltd., Luoyang, Henan 471009, China;

3. Shenzhen Metro Group Ltd., Shenzhen, Guangdong 518026, China

Received: 2009-05-04 Available online: 2009-07-10 14:46:04.000

Next Previous

Abstract

Based on the similarity theory and simulation experiment, main construction parameters of immersed tunnel are researched. The following items related with the simulation experiment are introduced, which include the model design, experiment process, important points for attention and the technical requirements. A large of the immediate data is obtained by the experiment. On the basis of analyzing test results, the main original parameters on construction of the immersed tunnel are verified and analyzed. The achievement of the experiment can be used to provide reference for the future engineering construction of immersed tunnel.

Figures

图1

图2

图3

图4

图5

图6

图7

References

[ 1 ] 杨小勇.沉管隧道施工初探[J].西部探矿工程,2006,(6):140-142 link1

[ 2 ] 李志坚.沉管法隧道基础采用灌砂回填技术的探讨[J].西部探矿工程,2002,(S1):176-177 link1

[ 3 ] 詹德新,王兴权,刘祖源,等.沉管隧道及其相关模型试验[J].武汉交通科技大学学报,2000,24(5):488-492 link1

[ 4 ] 邵俊江,李永盛.沉管隧道沉降问题分析[J].浙江交通科技,2005,(2):41-43

[ 5 ] 潘永仁,彭俊, Naotake Saito.上海外环沉管隧道管段基础压砂法施工技术[J].现代隧道技术,2004,41(1):44-48 link1

[ 6 ] 唐健.沉管隧道基础处理方法浅析[J].铁道勘测与设计,2004,(3):67-69

Related Research