Journal Home Online First Current Issue Archive For Authors Journal Information 中文版

Strategic Study of CAE >> 2009, Volume 11, Issue 7

Key technology of design and construction on immersed tube tunnel

School of Civil Engineering, Beijing Jiaotong University, Beijing 100044, China

Received: 2009-03-16 Available online: 2009-07-10 14:46:04.000

Next Previous

Abstract

Combined with the built immersed tube tunnel, comparison and selection of dry-dock scheme, waterproof design of tube sections and joints are analyzed. The key technologys such as tube prefabrication, tube floating, tube sinking, jointing underwater and foundation treatment method are generalized.

Figures

图1

图2

References

[ 1 ] 陈韶章.沉管隧道设计与施工[M].北京:科学出版社,2002

[ 2 ] 彭红霞.沉管隧道干坞方案比选[J].中国港湾建设,2007,26(1):42-45 link1

[ 3 ] 管敏鑫.越江沉管隧道管段及接头防水[J].现代隧道技术,2004,41(6):57-59 link1

[ 4 ] 陆明.沉管隧道管段接头等部位的防水防腐设计[J].中国建筑防水,2002,19(4):27-29 link1

[ 5 ] 潘永仁,丁美.大型沉管隧道管段沉放施工技术[J].现代隧道技术,2004,41(5):1-5 link1

[ 6 ] 张庆贺,高卫平.水域沉管隧道基础处理方法的对比分析[J].岩土力学,2003,24(增刊):349-352 link1

Related Research