Journal Home Online First Current Issue Archive For Authors Journal Information 中文版

Strategic Study of CAE >> 2011, Volume 13, Issue 3

Synthetic optimization modeling on mining and utilization of multi-deposits in Gushan mine area

1. State Key Lab of High-efficient Metal Mining & Safety, University of Science & Technology Beijing, Beijing 100083, China;

2. Gushan Mining Company, Ma-steel Group, Ma'anshan, Anhui 243184, China;

3. Jiangxi University of Science & Technology, Ganzhou, Jiangxi 341000, China

Funding project:国家“十一五”科技支撑计划资助项目(2006BAB08B01) Received: 2009-08-10 Available online: 2011-03-17 11:24:52.000

Next Previous

Abstract

Based on the concept of full-scale mining,that is,the concept of research on the mining and utilizing of mineral resources of multi-deposits in a mine area by systematic and dynamic considering of mine full-life process, a synthetic optimizing model of artificial neutral network (ANN) export system is set up.By using the model ,a synthetic optimization for the mining and utilization deposits at Gushan mine area is carried out, and the suggested ore production scale for the Gushan mine area is 5.4~6.8 million t/a. The optimized results are helpful to the strengthening construction, the improvement of economical and social benefit and the sustainable development of Gushan mine area.

Figures

图1

图2

图3

References

[ 1 ] 张国强,李交平,郑志军,等.白象山铁矿的水文地质问题及解 决措施[ J] .矿业快报,2008 ,24 ( 3 ) :69 -72. link1

[ 2 ] 徐克创,钟铁.姑山矿矿区生态建设规划的探讨[J].金属矿山,2004,(6):50-52. link1

[ 3 ] 刑立亭,徐征和,王青.矿产资源开发利用与规划[M].北京:冶金工业出版社,2008.

[ 4 ] 郑明贵,蔡嗣经.基于理想点法的金属矿山扩建方案选择[J].金属矿山,2008(7):5-8. link1

[ 5 ] Cavender B.Determination of the optimum lifetime of a mining pro- ject using discounted cash flow and option price techniques [ J] . Mining Engineering,1992 ,44 ( 10 ) :5 -11.

[ 6 ] 王秀山.复杂系统演化过程的有序性和无序性[J].系统辩证学学报,2005,13(1):44-47 link1

[ 7 ] 汤万金,高林,吴刚,等.矿区可持续发展系统动力学模拟与调控[J].生态学报,2000,20(1):20-27. link1

[ 8 ] 郑明贵,蔡嗣经.地下开采金属矿山扩建合理规模智能化系统[J].系统工程理论与实践,2008,28(12):133-139. link1

[ 9 ] Torries T F.NPV or IRR? Why not both[ J] .Mining Engineering, 1998 ,50 ( 10 ) :69 -73.

[10] 刘丽员,杨昔阳.基于神经网络的专家系统概述[J].辽宁经济管理干部学院学报,2009(1):101-103. link1

[11] McLoone S, Brown M D, Irwin G ,et al.A hybrid linear /nonlin- ear training algorithm for feedforward neural networks [ J] .IEEE Transactions on Neural Networks,1998 ( 9 ) ,9 :669 -683. link1

[12] 胡中栋,曾志勇,黄小岭.基于BP神经网络的专家系统体系结构[J].电脑开发与应用,2008,21(7):51-53. link1

[13] 吉孔诗,潘昊.基于神经网络的专家系统体系结构[J].微机发展,2001(6):11-13. link1

[14] 余辉.马钢集团发展战略研究[D].安徽:合肥工业大学,2008. link1

[15] 毛益平,黄礼富,赵福刚.我国铁矿山选矿技术成就与发展展望[J].金属矿山,2005(2):1-5. link1

[16] 闫旭骞,胡丽竹,王广成.矿区可持续发展评价方法研究[J].有色金属(矿山部分),2003,55(4):2-4. link1

Related Research