Journal Home Online First Current Issue Archive For Authors Journal Information 中文版

Strategic Study of CAE >> 2009, Volume 11, Issue 12

Treatment techniques for +990 Karst ofDazhiping Tunnel of Yichang-Wanzhou Railway

1. School of civil Engimeering,Beijing Jiaotong university, Beijing 100044, China;

2. China Railway 16th Group Co., Ltd, Beijing 100018, China

Received: 2009-10-30 Available online: 2009-12-15 09:10:52.000

Next Previous

Abstract

This paper mainly introduced Yichang-Wanzhou Railway Dazhiping Tunnel DK133+990 karst excrescent body's hydrogeology characteristics, karst development scale, water inrush and mud burst processes and characteristics of high-pressure water-rich cavern. According to karst cave project, hydrogeology condition and water inrush and mud burst mechanisms, cave processing should comprehensively take many factors, such as construction and operation safety, ect. into consideration, and abide by the principle of "releasing energy to reduce pressure, reinforcing by grouting, supporting in advance and processing comprehensively" .

Figures

图1

图2

图3

图4

图5

图6

图7

图8

图9

图10

图11

图12

图13

图14

图15

References

[ 1 ] 刘招伟,张民庆,王树仁.岩溶隧道灾变预测与处治技术[M].北京:科学出版社,2007.76-98

Related Research