Abstract

The central tower of Taizhou Bridge adopts the vertical steel tower structure for the first time in the world and its manufacturing and installation are also difficult. Through targeted analysis in the steel-concrete composite section, the integral segment, the lower link segment and different structural forms of the steel tower, we propose different manufacturing programs for different segments, and the application to Taizhou Bridge will provide references and technical support for using high-strength steel plate and manufacturing of the steel tower with complex structural forms.

Figures

图1

图2

图3

图4

图5

图6

图7

图8

Related Research