Journal Home Online First Current Issue Archive For Authors Journal Information 中文版

Strategic Study of CAE >> 2010, Volume 12, Issue 7

Research on processing equipment of main cable strand for suspension bridge with super length, large size and high strength

1. Shanghai Pujiang Cable Co., Ltd., Shanghai 201314, China;

2. Zhejiang Provincial Construction Headquarters of Zhoushan Islands Link Project, Zhoushan, Zhejiang 316000, China

Funding project:国家科技支撑计划项目(2008BAG07B03) Received: 2010-04-20 Available online: 2010-07-16 15:44:18.000

Next Previous

Abstract

The processing equipment of main cable strand with super length, large size and high strength was described in this paper. It provided reliable industrial equipment for the manufacturer of suspension bridge and satisfied the requirements of large-scale production.

Figures

图1

图2

图3

图4

图5

图6

图7

图8

图9

图10

图11

图12

图13

References

[ 1 ] JTT395-1999,悬索桥预制主缆丝股技术条件[S].

[ 2 ] 王福敏.PWS法主缆索股制作与架设中的关键技术[J].公路交通技术,2003,(6):58-61 link1

Related Research