Saddle pushing analysis in suspension bridge construction

1. Southwest Jiaotong University, Chengdu 610031, China;

2. Zhejiang Provincial Construction Headquarters of Zhoushan Islands Link Project, Zhoushan, Zhejiang 316000, China

Funding project:国家科技支撑计划项目资助(2008BAG07B05) Received: 2010-04-02 Available online: 2010-07-16 15:44:53.000

Next Previous

Abstract

Some problems existing in saddle pushing, such as the pre-displacement control principle, the relation of tower top displacement and tower bottom stress, the method of determining saddle pushing stages and pushing values, are discussed. The reasonable model of saddle equilibrium condition and the pre-displacement calculation method are expounded. Combining with saddle pushing analysis of Baling River Bridge, the conclusion that the excess pushing scheme can increase the interval of each pushing and reduce pushing times is obtained. The cases following saddle pushing are the unfavorable conditions for main cables anti-sliding checking.

Figures

图1

图2

图3

图4

References

[ 1 ] 钱冬生,陈仁福.大跨径悬索桥的设计与施工[M].成都:西南交通大学出版社,1999

[ 2 ] 中华人民共和国交通部.JTJxxx─2002公路悬索桥设计规范(报批稿)条文说明[S].北京:人民交通出版社,2002

[ 3 ] 唐茂林.大跨度悬索桥空间几何非线性分析与软件开发[D].成都:西南交通大学,2003 link1

[ 4 ] 孙胜江,姜军.悬索桥索塔容许偏位及主索鞍顶推分析[J].公路,2007,10:54-57 link1

[ 5 ] 王喜良,岳振民.大跨度悬索桥塔顶位移控制分析[J].桥梁建设,2003,6:38-40

[ 6 ] 何为,项贻强,徐兴.悬索桥施工中索鞍顶推的小步快跑原则[J].浙江大学学报(工学版),2007,41(1):134-138 link1

[ 7 ] 罗喜恒.鞍座对悬索桥主缆线形的影响及确定鞍座顶推时间的合理方法研究[A].第十六届全国桥梁学术会议论文集[C].北京:人民交通出版社,2004.424-431

[ 8 ] 唐茂林,沈锐利,强士中.悬索桥索鞍位置设计[J].公路交通科技,2003,18(4):54-58 link1

[ 9 ] 沈锐利.悬索桥主缆系统设计及架设计算方法研究[J].土木工程学报,1996,29(2):3-9 link1

[10] 西南交通大学桥梁工程系.贵州坝陵河大桥总体复核计算报告[R].成都:西南交通大学,2008