Strategic Study of CAE >> 2010, Volume 12, Issue 7
The technology of the figure of test assembling when buildingthe steel box of Xihoumen suspension big bridge
1. China Railway Baoji Group Co. Ltd.,Baoji, Shaanxi 721006, China;
2. Zhejiang Provincial Construction Headquarters of Zhoushan Islands Link Project, Zhoushan, Zhejiang 316000, China
Next Previous
Abstract
Horizontal preframe method was adopted when steel stiffening girders of Xihoumen Bridge were fabricated, i.e. the steel box girders were pre-assembled in horizontal direction. To insure the vertical line figure of girder segments is right, relevant parameters should be calculated and stimulated first according to design data, then every part of the steel box should be adjusted in preframe process, and finally the linear accuracy should be checked.
Keywords
horizontal preframe ; vertical line figure ; calculate ; adjust ; check
References
[ 1 ] 中华人民共和国交通部.公路桥涵施工技术规范(JTJ041-2000)[S].北京:人民交通出版社,2000
[ 2 ] 中华人民共和国铁道部.铁路钢桥制造规范(TB10212-1998)[S].北京:中国铁道出版社,2000
[ 3 ] 中华人民共和国建设部.钢结构工程施工质量验收规范(GB50205-2001)[S].北京:中国计划出版社,2001