Study on the grouting technology adopted in F1 weathered trough for Xiamen Xiang’an Subsea Tunnel

1. Beijing Jiaotong University, Beijing 100044, China;

2. CCCC Second Highway Consultants Co.Ltd., Wuhan 430056, China

Funding project:国家自然科学基金面上项目(40772184) Received: 2010-08-30 Available online: 2011-09-15 09:59:51.000

Next Previous

Abstract

Focusing on F1 weathered trough which has maximum water inflow and great difficulty in construction in Xiamen Xiang'an Subsea Tunnel,full-sectional grouting reinforcement and waterproofing,5 m grouting inside heading, 70 m along longitudinal direction of tunnel and superfine cement single-fluid grouting as major grouting material were applied according to poor geological conditions and the character of sudden water inflow. Meanwhile,the corresponding parameters of grouting were established after drillings for grouting were conducted. The results of field monitoring and numerical calculation during construction show that the grouting-effect meets the qualifications of design and construction of Xiamen Xiang'an Subsea Tunnel. The research results can provide technical reference for similar projects in grouting and waterproofing.

Figures

图1

图2

图3

图4

图5

图6

图7

图8

References

[ 1 ] 王梦恕,皇甫明.海底隧道修建中的关键问题[J].建筑科学与工程学报,2005,22(4):1-4. link1

[ 2 ] 孙钧.海底隧道工程设计施工若干关键技术的商榷[J].岩石力学与工程学报,2006,25(8):1513-1521. link1

[ 3 ] 孙锋,陈铁林,张顶立,等.基于宾汉体浆液的海底隧道劈裂注浆机理研究[J].北京交通大学学报,2009,33(4):1-6. link1

[ 4 ] 李治国.隧道岩溶处理技术[J].铁道工程学报,2002(4):61–67. link1

[ 5 ] 岩土注浆理论与工程实例协作组.岩土注浆理论与工程实例[M].北京:科学出版社,2001:115-118.

[ 6 ] 李蓉,李治国.海底隧道全、强风化花岗岩地层注浆技术研究[J].现代隧道技术,2008,45(1):21-29. link1

[ 7 ] 张民庆,张文强,孙国庆.注浆效果检查评定技术与应用实例[J].岩土工程学报,2006,25(2):3909-3918. link1