Journal Home Online First Current Issue Archive For Authors Journal Information 中文版

Strategic Study of CAE >> 2010, Volume 12, Issue 12

Technology of strengthening soil and keeping pressure of large diameter slurry shield inside with high pressure

Beijing Underground Diameter Project Department, China Railway Tunnel Group, Beijing 100045, China

Received: 2010-08-10 Available online: 2010-12-16 12:59:38.000

Next Previous

Abstract

Based on the engineering example of underground diameter project replacing the cutter teeth inside with high pressure, the application of grouting reinforcement and pile foundation reinforcement in soil strengthening was discussed. The causes of gas leakage of inside with high pressure were analyzed, and the countermeasures were proposed for assuring the normal construction of shield.

Figures

图1

图2

图3

图4

图5

图6 

图7

图8

References

[ 1 ] 洪开荣.广深港大断面特长水下盾构隧道的技术难点分析[J].隧道建设,2007,27(6):1-3. link1

[ 2 ] 张民庆,卓越,韩忠存.广州地铁杨体区间饱和含水砂层施工[J].世界隧道,1998(6):106-107. link1

[ 3 ] 李继宏,许燕峰,王凤忠.跟踪注浆在保护周边建筑物中的应用———广州以太广场建筑物的沉降及控制[J].现代隧道技术,2002,39(1):32-36. link1

[ 4 ] 张民庆,汪玉华,郭小华.广州地铁越秀公园站注浆截水帷幕施工技术[J].施工技术,2002,31(1):31-32. link1

[ 5 ] 杜闯东,贾航,王坤.大直径泥水盾构复合地层进仓技术比较与应用[J].隧道建设,2009,29(4):435-440. link1

Related Research