Journal Home Online First Current Issue Archive For Authors Journal Information 中文版

Strategic Study of CAE >> 2010, Volume 12, Issue 12

Analysis and control of significant risk source of underground diameter project from Beijing railway station to Beijing railway west station

1. Tunnel and Underground Engineering Research Center of Ministry of Education, Beijing Jiaotong University, Beijing 100044, China;

2. Indentificationg of the Ministry of Railways Engineering, Beijing 100844, China;

3. Central Station of Security and Euality Supervision, Ministry of Railways, Beijing 100045, China;

4. Technology Center of China Railway Tunnel Group, Luoyang, Henan 471009, China

Received: 2010-08-11 Available online: 2010-12-16 13:03:13.000

Next Previous

Abstract

Through the detailed risk evaluation on underground diameter project from Beijing railway station to Beijing railway west station, the conditions of all the risk sources along were analyzed adequately. At last, effective control measures of risk prevention and reduction were proposed based on the evaluations results. The settlement of all the measuring points of metro line 2 was lower than 2 mm. Due to the tunnel excavation the settlement of Tianningsi Bridge was lower than 3 mm. The construction impact on surrounding building was very small.

Figures

图1

图2 

图3

图4

图5

References

[ 1 ] 黄宏伟,朱琳.上海地铁11号线关键节点工可阶段工程风险评估[J].岩土工程学报,2007,29(7):1103-1104. link1

[ 2 ] 黄宏伟.隧道及地下工程建设中风险管理研究进展[J].地下空间与工程学报,2006,2(1):13-20. link1

[ 3 ] 杨更社,吴成发.西安地铁1号线区间特殊地段施工风险评估[J].西安科技大学学报,2010,30(2):159-160. link1

[ 4 ] 毛儒.隧道工程风险评估[J].隧道建设,2003,23(2):1-3. link1

Related Research