Strategic Study of CAE >> 2011, Volume 13, Issue 7

The construction management system and practice of Three Gorges Project

China Three Gorges Corporation, Yichang, Hubei 443002, China

Received: 2011-05-20 Available online: 2011-07-08 15:10:53.000

Next Previous

Abstract

Three Gorges Project (TGP), the largest water resources and hydropower project in the world with huge scale and complex techniques, has great comprehensive benefits mainly in flood control, power generation and navigation improvement. Through 16year construction and operation, some valuable experience in the management system and mechanism for hydropower project construction have been gained, and its construction management mode produces important influence on the management system of domestic capital construction. With combination of the construction management practice of TGP, the characteristics of management system and mechanism are summarized, and the suggestions on current hydropower development system and construction management mode are put forward.

References

[ 1 ] 三峡办综合司,资金计划司,国家发改委投资研究所.对三峡工程宏观管理体制的认识[J].中国投资,2009(2):92-94. link1

[ 2 ] 徐长义,樊启祥.建设项目管理模式与三峡工程管理实践[J].中国三峡建设:人文版,2003,10(4):30-32. link1

[ 3 ] 陆佑楣.三峡工程建设项目管理与实践[J].中国三峡建设,2002(2):58-60. link1

[ 4 ] 张宝声.三峡工程建设管理模式与投资控制方法[J].水力发电,2000(6):12-15. link1

[ 5 ] 贺恭,陈文斌.三峡工程八年来建设管理经验综述[J].中国三峡建设,2001(11):1-6. link1

[ 6 ] 王燕.三峡准备工程合同管理[J].中国三峡建设,1999(1):35-36. link1

[ 7 ] 于翔汉.贯穿于三峡工程建设的合同管理制[N/OL].三峡工程报,2005-01-28.http://www.ctgpc.com.cn/news/view_info.php?mNewsId=12329.

Related Research