Research and application of safety management dashboard for metro construction

Research Institute of Construction Management, School of Civil Engineering & Mechanics, Huazhong University of Science & Technology, Wuhan 430074, China

Received: 2011-06-05 Available online: 2011-08-23 08:47:44.000

Next Previous

Abstract

Metro construction safety is affected by many factors,such as engineering geology condition, nearby buildings and engineering design plan, etc.This paper proposes a dashboard tool based on 3D models to control the safety of metro construction. Risk activities and current safety status of the construction can be identified and shown via this dashboard. It can help project managers to figure out the safety status of the construction and risk activities intuitively and timely which improves safety management in metro construction.

Figures

图1

图2

图3

图4

图5

图6

图7

References

[ 1 ] 吕治国,闫琪.虚拟现实技术在建筑工程安全管理中的应用[J].建筑安全,2009(4):58-60. link1

[ 2 ] 张利,张希黔,石毅.虚拟施工技术应用实践和研究开发展望[J].工业建筑,2003(11):49-51,75. link1

[ 3 ] Sang Uk Han, Feniosky Peňa -Mora, Mani Golparvar -Fard, et al.Application of a visualization technique for safety management [ C] //Proceedings of the 2009 ASCE International Workshop on Computing in Civil Engineering, 2009 : 544 -551.

[ 4 ] Hu Zhenzhong, Zhang Jianping, Deng Ziyin.Construction process simulation and safety analysis based on building information model and 4D technology [ J] .Tsinghua Science and Technology, 2008 , 13 ( z1 ) :266 -272. link1

[ 5 ] Gregory Carter, Simon D Smith.Safety hazard identification on construction projects [ J] .Journal of Construction Engineering and Management,2006 ,132 :197 -205. link1

[ 6 ] Clark GT, Borst A.Addressing risk in seattle ’ s underground [ J] .PB Network, 2002 ( 1 ) :34 -37.

[ 7 ] Sturk R,Olsson L, Uohansson U.Risk and decision analysis for large underground projects, as applied to the stockholm ring road tunnels [ J ] . Tunneling and Underground Space Technology, 1996 ,11 ( 2 ) :157 -164. link1

[ 8 ] Song K, Pollalis S, Peňa -Mora F.Project dashboard: concurrent visual representation method of project metrics on 3D building models[ C] //Proc Int Conf on Computing in Civil Engineering, ASCE, 1 -10.2005.

Related Research