Journal Home Online First Current Issue Archive For Authors Journal Information 中文版

Strategic Study of CAE >> 2011, Volume 13, Issue 12

Intelligent compaction theory of high roller compacted concrete dam

1.School of Civil Engineering, Tianjin University, Tianjin 300072, China;

2.State Key Laboratory of Hydraulic Engineering Simulation and Safety, Tianjin University, Tianjin 300072, China

Funding project:国家自然科学基金创新研究群体科学基金(51021004);国家自然科学基金(51079096);教育部新世纪优秀人才计划资助(NCET-08-0391) Received: 2011-09-16 Available online: 2011-12-13 11:20:56.000

Next Previous

Abstract

In the paper, the concept and realization process of intelligent compaction for high roller compacted concrete dam construction was presented, as well as the theory of real-time monitoring and intelligent feedback control. Based on the analysis of real-time compaction index, a multiple regression model of the dam compactness was established and a real-time estimation method of compaction quality of the entire work area for roller compacted concrete dam was proposed finally. The adaptive adjustment of the roller work parameters was achieved, with the speed, exciting force, the rolling pass and the compacted thickness meeting the standard during the entire construction process, and the compaction quality and construction efficiency can be both improved as a result. What's more, the research provides a new way for the construction quality control of roller compacted concrete dam.

Figures

图1

图2

图3

图4

References

[ 1 ] 中华人民共 和 国 国 家 经 济 贸 易 委 员 会.DL /T 5112 -2000 水 工碾压混凝土坝施工规范[ S] .郑州:郑州大学出版社,2000.

[ 2 ] 徐玉杰.碾压混凝土坝施工技术与质量控制[ M] .郑 州:黄河 水利出版社,2008.

[ 3 ] Carlos Zambrano, Vincent Drnevich, Philippe Bourdeau. Ad- vanced compaction quality control [ R] .U.S.Indiana: School of Civil Engineering, Purdue University, 2006.

[ 4 ] Bekker M G.Introduction to Terrain -Vehicle Systems [ M] .Ann Arbor: The University of Michigan Press, 1969.

[ 5 ] Komandi G.An evaluation of the concept of rolling resistance [ J] .Journal of Terramechanics,1999 ,36 ( 3 ) :159 -166. link1

[ 6 ] Kaufmann K, Anderegg R.3D-construction applications III: GPS- based compaction technology[ C] //Proceedings of the 1st Interna- tional Conference on Machine Control & Guidance.ETH Zurich, Swiss: 2008 , 1 -10.

[ 7 ] Anderegg R, Kaufmann K I.Compaction with vibratory rollers [ J ] . Journal of Transportation Research Board, 2004 , 1868 : 124 -134.

[ 8 ] Sandstrom A, Pettersson J C.Intelligent systems for QA /QC in soil compaction[ C] //Proceedings of the 83rd Annual Transporta- tion Research Board Meeting.Washington D C, 2004 :1 -17.

[ 9 ] Mooney M A, Rinehart R V.Field monitoring of roller vibration during compaction of subgrade soil [ J ] .Journal of Geotechnical and Geoenvironmental Engineering,2007 ,133 ( 3 ) :257 -265. link1

[10] Mooney M A, Rinehart R V.Instrumentation of a roller compac- tor to monitor vibration behavior during earthwork compaction [ J] .Journal of Automation in Construction,2007 ,17 ( 2 ) :144 - 150. link1

[11] 张润利,张俊杰,李熙山.振动压路机压实度连续检测仪[J].工程机械,2000,32(8):4-6. link1

[12] 居彩梅.车载式压实度检测仪[D].西安:长安大学,2001. link1

[13] 武雅丽,王鹊,卫雪莉.振荡压实度计的试验与研究[J].中国公路学报,1998,11(4):121-126. link1

[14] 马学良,孙祖望,杨东来.振荡压路机智能化控制策略的研究[J].中国工程机械学报,2008,6(3):299-305.

[15] 黄声享,刘经南.GPS实时监控系统及其在堆石坝施工中的初步应用[J].武汉大学学报,2005,30(9):813-816. link1

[16] Zhong Denghua, Cui Bo, Liu Donghai.Theoretical research on construction quality real-time monitoring and system integration of core rock-fill dam[ J] .Science in China ( Series E: Technologi- cal Sciences) , 2009 , 52 ( 11 ) : 3406 -3412. link1

[17] Zhong Denghua, Liu Donghai, Cui Bo.Real-time compaction quality monitoring of high core rockfill dam[ J] .Science in China ( Series E: Technological Sciences ) , 2011 , 54 ( 7 ) : 1906 - 1913. link1

[18] Petersen D, Siekmeier J, Nelson C, et al.Intelligent soil com- paction-technology, results and a roadmap toward widespread use [ J] .Journal of the Transportation Research Board, 2006 , 1975 : 81 -88. link1

[19] Cressie N.Statistics for Spatial Data [ M] .New York: Wiley, 1993.

Related Research