Strategic Study of CAE >> 2012, Volume 14, Issue 4
Microseismic monitoring application for waterflooding in No.6 oil reservior of Yanchang Oilfield
1. Yanchang Oilfield Company Ltd., Yan'an, Shaanxi 716000, China;
2. Zichang Oil Production Plant, Yanchang Oilfield Company Ltd., Zichang, Shaanxi 717300, China
Next Previous
Abstract
This paper discusses the long 6 extend oilfield injection wells because the transfer group and the leading edge of microseismic monitoring of water. Yanchang Oil Field Oil Production Plant 4237 Zichang water injection wells set the direction of NEE to the front edge by the impact of in situ stress field in the direction of the strong. That injector network layout should also refer to the in-situ stress field direction and the original crack direction.