Make full use of the dredged soil for speeding up reclamation of Hengsha east shoal
Shanghai Waterway Engineering Design and Consulting Co., Ltd., Shanghai 200120, China
Next Previous
Abstract
According to Hengsha east shoal reclamation projects implementation, combined with the Yangtze estuary harbors and channels dredged soil disposal condition, this paper analyses the main problems of using the Yangtze estuary dredged soil to Hengsha east shoal reclamation. According to Hengsha ocean metro construction planning, it calculates reclamation scale and soil demand, and proposes the implementation principles and scheme of using the Yangtze estuary dredged soil for speeding up Hengsha east shoal reclamation, and gives some helpful suggestions.
References
[ 1 ] 季 岚,唐 臣,张建峰,等.长江口疏浚土在横沙东滩吹填工 程中的应用[J].水运工程,2011,36(7):163-167. link1
[ 2 ] 季 岚,唐 臣.上海港外高桥和罗泾港区支航道疏浚工程初 步设计[R]. 上海:中交上海航道勘察设计研究院有限公司, 2010.
[ 3 ] 周 海,阮 伟.促进上海港口与航道资源的联动开发研究 [R]. 上海:上海市科学技术协会,上海市水利学会,中交上海航 道勘察设计研究院有限公司,2011.
[ 4 ] 唐一泓. 上海市政府与交通运输部签署《加快推进国际航运中 心建设合作备忘录》[EB/OL].[2010-01-28].http://sh.xinmin. cn/minsheng/2010/01/28/3485580.html.