Journal Home Online First Current Issue Archive For Authors Journal Information 中文版

Strategic Study of CAE >> 2013, Volume 15, Issue 8

North anchorage project construction key technology in the Fourth Nanjing Yangtze River Bridge

1. The Fourth Bridge Construction Headquarters in Nanjing, Nanjing 210000, China;

2. CCCC Second Highway Engineering Co., Ltd, Xi'an 710069, China

Received: 2013-05-15 Available online: 2013-08-28 07:36:20.000

Next Previous

Abstract

North anchorage of the Fourth Nanjing Yangtze River Bridge is a kind of gravity anchor. Distributed mortise-tenon anchor system of Reinforced Concrete is designed for its anchor system structure first time in China. Thermal stress and temperature control is the key technique in large mass concrete construction of this anchorage. This article will introduce large mass concrete temperature control method,anchor system fixing technology and high-accuracy survey technology of North anchorage of the Fourth Nanjing Yangtze River Bridge.

Figures

图1

图2

图3

图4

图5

图6

图7

图8

图9

图10

图11

Related Research