Strategic Study of CAE >> 2013, Volume 15, Issue 9

Installation and demolition technology of Bailey truss of Three Gorges Project ship lift

China Gezhouba Group Co., Ltd. Three Gorges Company, Yichang, Hubei 443002, China

Received: 2013-06-20 Available online: 2013-09-10 13:14:10.000

Next Previous

Abstract

The installation and demolition of Bailey truss support system of Three Gorges Project ship lift belongs to be grade separation operation. Because of the narrow construction site, high construction strength, and big construction disturbance, the installation and demolition of Bailey truss has been one of the construction problems of Three Gorges Project. The installation and demolition technology system of bailey truss support system has been established based on the analysis of construction environment and the characteristics and requirements of different parts. The technology system contains the layout of construction equipment, the division of lifting units, the set of lifting point, and demolition plans of different parts and so on. This technology system ensures the smooth implementation of the installation and demolition of bailey truss. Construction schedule, cost, and safety of this project have achieved good results, and this technology system can provide a reference for similar project.

Figures

图1

图2

图3

图4

图5

图6

References

[ 1 ] 李云华. 钢管临时支撑和贝雷架在施工实践中的应用[J]. 山西 建筑,2011,37(2):163-166. link1

[ 2 ] 薄文江.贝雷架高空支模施工的技术探讨[J]. 山西建筑,2010, 36(36):139-140. link1

[ 3 ] 王建平,聂本武,李 智. 三峡升船机立体交叉作业的风险控制 措施研究[J]. 安全与环境工程,2013,20(1):147-150. link1

Related Research