Deformation monitoring on Three Gorges Project ship lift tower during construction period

China Gezhouba Group Surveying & Mapping Engineering Institute, Yichang, Hubei 443002, China

Received: 2013-06-28 Available online: 2013-09-10 13:15:08.000

Next Previous

Abstract

This paper begins with internal and external factors as well as field operating conditions during the monitoring process. According to the accuracy analysis which is done to several typical monitoring methods and the study which is done to the 360° reflecting prism test, the final choice is that total station polar coordinate would be used as the deformation monitoring method of Three Gorges Project ship lift tower during construction period, and deformation analysis is received using the long-term monitoring data obtained by the use of the method. The results show that tower deformation is greatly affected by temperature; the greater the temperature difference, the greater the deformation. It would be small deformation or even no deformation when temperature difference is small or under constant temperature.

Figures

图1

图2

图3

图4

References

[ 1 ] 李青岳,陈永奇. 工程测量学[M]. 第 3 版. 北京:测绘出版社, 2008.

[ 2 ] 吴子安,吴栋材. 水利工程测量[M]. 北京:测绘出版社,1990.

[ 3 ] 国家能源局. DL/T 5173—2012 水电水利工程施工测量规范 [S]. 北京:中国电力出版社,2012.

[ 4 ] 中华人民共和国国家经济贸易委员会. DL/T 5178—2003 混凝 土坝安全监测技术规范[S]. 北京:中国电力出版社,2003.

Related Research