Research on concreting equipment planning of ship lift boat cab segment in Three Gorges Project

China Gezhouba Group Co., Ltd. Three Gorges Company, Yichang, Hubei 443002, China

Received: 2013-06-29 Available online: 2013-09-10 13:10:01.000

Next Previous

Abstract

This paper describes the selection process on concrete construction equipment of ship lift boat cab segment in Three Gorges Project in detail, including analysis on the characteristics of concrete construction in boat cab segment, selection argumentation of construction equipment at the tender stage and system adjustment and optimization of equipment selection at the construction stage. The engineering practice effect of construction equipment indicates that the concrete pouring equipment layout plan for Three Gorges Project ship lift boat cab section effectively covers all pouring surface, meeting the warehousing strength requirements in concrete pouring peak, and the construction schedule, cost, safety, can be effectively controlled. The concreting equipments of Three Gorges Project ship lift boat cab segment have been pre-rational planned, post-system adjusted and optimizated , they play an important role in the successful end of construction of Three Gorges ship lift project, and they have high promotion and application value.

Figures

图1

图2

图3

References

[ 1 ] 孙精石,周兴华,赵德志,等.关于升船机的调查研究[J].水道港 口,2001,22(3):141-145. link1

[ 2 ] 朱 虹,邓润兴.三峡升船机总体布置设计[J].人民长江,2009, 40(27):48-50. link1

[ 3 ] 梁仁强,李 锋.三峡升船机施工技术研究与实践[J].人民长江, 2011,42(16):51-55. link1

Related Research