Construction summary of Three Gorges Project ship lift

China Three Gorges Corporation, Bejing 100038, China

Received: 2013-08-06 Available online: 2013-09-10 13:21:56.000

Next Previous

Abstract

The ship lift of Three Gorges Project is huge and technically complex, and as there is no similar ship lift in the world as a precedent putting into operation, it has been well concerned by domestic and international engineering and technical community. The design and research process of Three Gorges Project ship lift , has been strongly supported by many domestic scientific research and design units, their works provide a theoretical basis for the gradual improvement of the ship lift design. After scheme comparison, the Three Gorges Project ship lift eventually identified as rack and pinion climbing type, its equipment is of complex structure and its manufacture, installation and civil structure need high construction precision requirements, and the Sino-German joint design approach is adopted for the first time. The final review and acceptance for the design results of every stages are executed by Quality Experts Group of Three Gorges Project organized by the Three Gorges Project Corporation. For the technical difficulties and key technical issues of the ship lift, a series of special experimental researchs, such as "research on manufacturing technology of rack, nut column" are organized to examine the rationality and implement ability of the key project design of ship lift .To reduce the effect of tower column deformation on the installation accuracy of rack and nut column, some research and adjustment are done to the construction procedures of ship lift to ensure safe and reliable operation of ship lift. Engineering construction proofs that the management, technical measures undertaken in this paper are scientific and they ensure the smooth implementation of the construction of the Three Gorges Project ship lift.

Figures

图1

图2

图3

References

[ 1 ] 钮新强,覃利明,于庆奎. 三峡工程齿轮齿条爬升式升船机设 计[J]. 中国工程科学,2011,13(7):96-103. link1

[ 2 ] 梁仁强,李 锋. 三峡升船机施工技术研究与实践[J]. 人民长 江,2011,42(16):51-55. link1

Related Research