Precision Blasting Excavation of Underground Workshop Crane Beam of Rock Wall in Complicated Geology Condition

1. Luzhou Dingtai Blasting Engineering Co. Ltd.,Luzhou,Sichuan 646000,China;

2. Sinohydro Bureau 7th Co. Ltd.,Chengdu 611730,China

Received: 2014-09-01 Available online: 2014-11-21 10:43:32.000

Next Previous

Abstract

The geology condition of Xiang jiaba hydraulic power station underground workshop is very complicated. Characteristics of crane beam of rock wall construction embodied in width of rock bench, huge bearing load, high quality requirements, urgent construction period and so on. According to inherent conception of “precision blasting”, technological measures of optimized excavation sequence, steel tube frame for drilling, double smooth blasting, equal and minim explosive and plum blossom shaped holes were adopted in construction. Through which, precision control of explosive energy release and rock fragmentation were achieved, insured the blasting excavation quality. Half-hole rate in Ⅱ surrounding rock was 100%, in Ⅲ surrounding rock was 99.2%, in Ⅳsurrounding rock was 90~97.3%, the phenomenon of under break was avoided absolutely, the average over break value was only 2.9cm, the non-smoothness is 0~4cm, the influence depth because of blasting excavation unloading was 0.2~0.7cm, the excavation effect was nearly perfect.

Figures

图1

图2

图3

图4

References

[ 1 ] 谢先启. 精细爆破[M]. 武汉:华中科技大学出版社,2010.

[ 2 ] 汪旭光,于亚伦,刘殿中. 爆破安全规程实施手册[M]. 北京:人 民交通出版社,2004.

[ 3 ] 张正宇. 现代水利水电工程爆破[M]. 北京:中国水利水电出版 社,2003.

[ 4 ] 中华人民共和国国家发展和改革委员会. DL/T 5333—2005 水 电水利工程爆破安全监测规程[S]. 北京:中国电力出版社, 2006.

[ 5 ] 陈祖安. 中国水利发电工程(工程地质卷)[M]. 北京:中国电力 出版社,2000.